Post by tripletriplenut on Dec 21, 2011 19:04:56 GMT -5
fabrication of the 3 into 1 header begins left tube is cut and rolled. the center tube templates are laid out ready for tracing of course i had to built a new bench to work on and while i was at it i put in a new insulated garage door so i wouldn't freeze my but off.
|
|
|
Post by Walms on Dec 21, 2011 20:01:05 GMT -5
I'm looking forward to seeing how this works out!
|
|
|
Post by flipsk12 on Dec 21, 2011 20:55:29 GMT -5
I cant wait.
|
|
|
Post by bolly on Dec 22, 2011 1:32:03 GMT -5
ttnut, the titanium 3inta1?
|
|
|
Post by tripletriplenut on Dec 22, 2011 8:25:31 GMT -5
no practice first then use the good stuff.
|
|
jacko
2nd Gear
Posts: 468
|
Post by jacko on Dec 22, 2011 8:53:10 GMT -5
take your time and enjoy your build.
|
|
|
Post by wheeliehappy on Dec 22, 2011 10:40:40 GMT -5
Can't wait to see what magic transpires over the winter months, when are you planning on having it done ?
|
|
|
Post by tripletriplenut on Dec 22, 2011 17:21:14 GMT -5
hope to have it cut and welded by the weekend.
|
|
|
Post by Walms on Dec 22, 2011 20:49:14 GMT -5
Lollygagger... ;D
|
|
|
Post by tripletriplenut on Dec 22, 2011 22:03:53 GMT -5
took the guys at the print shop 2 weeks to make the templates and then i had to cut them out. a 4x8 sheet of mild steel is 56 bucks when my dad worked at algoma steel he was aloted 10 sheets a year and reduced price on everything else damn i miss that deal.
|
|
|
Post by tripletriplenut on Dec 30, 2011 21:42:28 GMT -5
|
|
|
Post by tripletriplenut on Dec 31, 2011 9:42:11 GMT -5
i wonder if this is the first ever 3 into 1 header that uses tapered header pipes instead if straight pipe? i have a pipe tweaked that peaks at 9000 rpm. starts making power at 3000rpm and just climbs to 9000rpm.
|
|
|
Post by Walms on Dec 31, 2011 11:40:37 GMT -5
Lookin good Don! Did the layout work ok?
|
|
|
Post by Walms on Dec 31, 2011 11:42:15 GMT -5
This is gonna be the nastiest sounding triple yet!!! ;D
|
|
|
Post by tripletriplenut on Dec 31, 2011 11:50:20 GMT -5
layout worked perfect just tightning up the pipes at the collecter to get as small as possible.
|
|